Drilling & Completions Supervisor

  • -10 Years Oil & Gas Experience
  • Bachelors Degree Petroleum Engineering
  • IWCF / IADC Well Control / Well Cap / Well Control Supervisor
  • Rig Pass
  • Horizontal Directional Drilling
  • Deep Water Drilling Development
  • Differential Pressure Pipe Sticking
  • English, Spanish Speaking
Product Enquiry

Extended Profile

-10 years’ Experience in the Oil and Gas Sector a Petroleum Engineer with experience in Drilling & Completions Engineering / Drilling Supervision on SSDR (6th, 5th and 4th generation), Jack-Up’s and Fixed/Assisted Rigs. Expertise including planning, coordination, execution and supervision of Drilling, Completions and Work over operations. Management in logistics of materials and personnel including risk assessment. Adept engineer providing supervision and problem solving while drilling Exploratory, Development and Appraisal Wells not only in Shallow but also Deepwater. Achieved company goals and met aggressive project deadlines on time and under budget by overseeing operations in different rigs and locations in order to increase Income and Productivity to the company. Proficient in a wide rage of operations such as Jetting, Evaluation of performance while drilling, Directional drilling, Wellbore evaluation, High angle and horizontal wells in Rotary or Sliding modes, Well control, Underbalanced drilling, Mudline, Cement Jobs (Casing strings, Production Liners, Inner string, Abandon cement plugs, Balanced cement plugs, etc.), Well testing (DST), Open-End test string, Coiled tubing Nitrogen Lifting, Slick-line, Well-shot using Wire line or TCP, Side tracking, Whipstock drilling, Casing milling, Artificial lift production and Electric submersible pumping systems for extra heavy oil.

 

Please follow and like us:
536

Day Rate $300.00 USD

The Average Rate payable for this Drilling & Completions Supervisor is $300.00 USD per Day. A Standard Contract Working Day is classed as 10 Hours with 1 unpaid Hour for Lunch. Additional “Perdiam” is Payable depending on location, which covers, Accommodation, Transport to and from the work site and Daily Allowance for Food, Beverage and Laundry. To estimate your daily team costs select the add this expert to your team. On Completion go to My Completion Team and Complete the Short Inquiry Form and we will do the rest…

Please follow and like us:
536

Senior Drilling & Completions Engineer

PEMEX – Senior Drilling & Completions Engineer Supervised Well Drilling and Completion of the very first project of Extra Heavy Oil Production in Mexico. Managed Enhanced Oil Recovery operations while using Electric Submersible Pumping Systems for producing extra heavy oil. Obtained an Aware for the Fastest Drilling of the Exploration Well “Ayatsil-283”.
 

Please follow and like us:
536

Senior Drilling & Completions Supervisor

PEMEX Senior Drilling & Completions Supervisor Supervised Well Drilling and Completion of the very first project of Extra Heavy Oil Production in Mexico. Managed Enhanced Oil Recovery operations while using Electric Submersible Pumping Systems for producing extra heavy oil. Obtained an Aware for the Fastest Drilling of the Exploration Well “Ayatsil-283”.

 

Please follow and like us:
536

Drilling & Completions Supervisor

PEMEX – Drilling & Completions Supervisor Supervised Well Drilling and Completion in the greatest oil-producing field in Mexico, Ku-Maloob-Zaap field. Complemented my skills in management, leadership and supervision while working in varied operations in different rigs and locations. Gained great experience in Underbalance drilling while drilling Paleocene and Cretaceous basin with presence of total loss of circulation. Supervised operations with Artificial lift production.
 

Please follow and like us:
536

Reviews

There are no reviews yet.

Be the first to review “Drilling & Completions Supervisor”

Your email address will not be published. Required fields are marked *

Drilling & Completions Engineer

PEMEX – Drilling & Completions Engineer / Drilling & Completions Supervisor Supervised the drilling of the very first Ultra Deepwater well in Mexico “Trion-1” with over 8 200 ft. below sea level. Supervised the drilling of the second Ultra Deepwater well “PEP-1” of over 9 000 ft. below sea level. Achieved an Aware for Drilling the First Well in the Biggest Gas-Condensate Reservoir in Mexico “Kunah-1”. Gained a wide experience in Subsea operations, Jetting, Well Testing (DST), Supervision and Coordination of high complexity operations.

 

 

Please follow and like us:
536