Start Up Commissioning Manager

Rated 5.00 out of 5 based on 3 customer ratings
(3 customer reviews)
  • 20 + Years Oil & Gas Experience
  • BSC Petroleum Engineering
  • BTEC Safety Engineering
  • Associate Member SPE
  • Associate IIRS
  • English Spanish Speaker
Product Enquiry

Extended Profile

20 Years + Experience in Production, Oil and Gas, Well Services, Shutdowns, Hand-overs, Pre-Commissioning, Commissioning and Start-Up. Able to write Procedures for a variety of tasks and have many years of experience in the following fields; Hydro testing, Leak testing, Hazop studies, P&ID verification, Nitrogen/Helium testing including high pressures. Have worked with; Separation systems, Pumps, Compressors, Generators, DCS systems, Amine plants, Glycol plants, Sulphur plants. Have acted as Company Rep for Factory Acceptance tests and in the Yards and on Site. Able to Propose and formulate detailed plans for a Shutdown or Plant Start-Up and then carry them out. Can use Windows XP, MS Project, MS Word, and MS Excel and have some knowledge of other programmes. Have several times used Opercomm and ICAPS the Total systems and have attended training courses on them. Have experience on Well testing, Wire line, Completions on the well services side. Have experience of Training and Safety both in classrooms and on site. Have worked at all levels from Operator to Superintendent both on Offshore and Onshore plants and from Engineer to Manager on Commissioning and Start-Up. Have worked with Boilers ,Heaters direct and indirect, Furnaces, Pumps, Compressors and all other types of equipment found in Oil and Gas plants During many projects was involved in starting one train while constructing another one, this is similar to shutdown work. Involved in identifying work scope, work areas, manpower and equipment required, preparing drawings and planning isolations etc as needed for the safety of personnel and plant during the shutdown and the consequent start-up. Preparing list of spares needed and special equipment, negotiating with specialist companies for their services. Preparing list of company personnel required for the job.I have many contacts within the industry and can assist with manning up a project. LNG plant worked on – Gas, Oil Metering, Coalescers, Inlet Gas Compressors, Oil Export Storage Tanks and Pumps, Off Spec Tank, LPG storage, Metering, Propane Refrigeration, MDEA and AGR, inlet Dryer, Regen Gas Compressors, Caustic System,Turbo Expander, Demethaniser, Debutaniser,, Fuel Gas, Claus Reactors, Incinerator, Quench Column, sulphur Liquid Storage and Solidification & Handling, Sales Gas Compressors and Gas Metering, Pig Launchers and Receivers and R.O Unit.

 

Day Rate $1000.00

The Average Rate payable for this Startup Commissioning Manager is $1000.00 USD per Day. A Standard Contract Working Day is classed as 10 Hours with 1 unpaid Hour for Lunch. Additional allowance is Payable depending on location to cover Accommodation, Transport to and from the work site and Daily Allowance for Food, Beverage and Laundry. To estimate your daily team costs select add this expert to your team. On Completion go to My Completion Team and Complete the Short Inquiry Form and we will do the rest…

 

Commissioning Coach

Preparing programs and videos on Training for Commissioning as requested by clients.

 

 

 

 

Commissioning Coordinator

Coordinating between client and contractor to achieve sail away date Meet daily with the applicable discipline Commissioning Engineer to ensure alignment of commissioning execution in the field against the two week look-ahead. Meet daily with the Snr Technicians to discuss work activities for the day, set targets and ensure that all are clear on requirements and deliverables. Attendance of daily meetings with CMT and Commissioning departments. Proactive in the promotion of HSSE at site, supporting the Client Management Team and Client HSSE Management in ensuring qedi personnel meet project HSSE objectives. Engage with Snr’s and Technicians daily in safety conversations ensuring high performance in HSSE across the team. Report back on daily progress and workscope completion ensuring all issues and concerns are clearly communicated and addressed. Prepare workscope for execution against the two week look ahead, ensuring all requirements (materials, permits, checksheets etc.) are in place to support completion. Identify efficiencies in workscope execution methodology and sequence with a view to support, where applicable workscope acceleration. Liaise with the completions team to ensure that all certification and handovers are in place being progressed against the two week look ahead schedule and identify where acceleration required. Manage performance of the Snr’s ensuring all duties against R&R are being completed effectively and efficiently and that the management of the Technicians is of a good standard. Support where applicable (in conjunction with the Workforce Co-ordinator) disciplinary requirements ensuring that these are closed out in line with project process and procedure. Conduct daily site walk-arounds ensuring on-going engagement with qedi personnel. Compile necessary reports pertaining to workscope execution and progress which require recording / reporting.

 

 

Commissioning Auditor

Working with Internal Audit department to carry out an audit On the company Commissioning practices for the IKWEZI Project Checking POV procedures

 

 

 

3 reviews for Start Up Commissioning Manager

  1. Rated 5 out of 5

    Commissioning Administrator

    Very skilled Commissioning Manager able to build a strong Team taking care of Clients’ needs. He is able to give the best solution for any issue showing to the Client how to proceed in the best way respecting schedule, costs, quality and safety. He has my personal and professional respect.

  2. Rated 5 out of 5

    Commissioning Administrator

    It was pleasure to work with this Commissioning Manager for VOC Phase 1 project in Ras Laffan, he was highly experienced not only in Commissioning but in safety and Construction also. He always push to complet the work in a cost effective manner, always convincing when discussions are open especially with clients. Very good team leader and can dilver what ever being asked in acceptable perfect manner.
    “Jehad Karmi”

  3. Rated 5 out of 5

    Commissioning Administrator

    Overall expert when it comes to Pre-commissioning/commissioning management. Huge knowledge in pre-commissioning/commissioning activities. Able to handle critical issues and problems during pre-commissioning/commissioning executions.

Add a review

Your email address will not be published. Required fields are marked *

Commissioning Manager

Commissioning Manager responsible for all aspects of Commissioning a Utilities complex serving 10 plants for Mobin Iran with Snamprogetti. Responsible for ensuring Construction completed by system to facilitate Commissioning. Then take over as Commissioning manager and do all necessary testing and proving of the system finally handing over to the client. This includes all commissioning paperwork and final contract documents including POV procedures and verification.

 

Deputy Commissioning Manager

Deputy Commissioning Manager responsible for all aspects of Commissioning a 1000 MM scfd gas plant and Sulfur plant with Associated Utilities South Pars Phase 1 on contract to Daelim of Korea. Working in a start up team to achieve a safe introduction of hydrocarbons to the plant Equipment included: Slug Catcher, Methanol Injection,Crude Stabiliser, Desalters, Flash Gas, Oil Metering, Coalescers, Inlet Gas Compressors, Oil Export Storage Tanks and Pumps, Off Spec Tank, LPG storage, Metering, Propane Refrigeration, MDEA and AGR, inlet Dryer, Regen Gas Compressors, Caustic System,Turbo Expander, Demethaniser, Debutaniser,, Fuel Gas, Incinerator, Quench Column, Sales Gas Compressors and Gas Metering, Pig Launchers and Receivers and R.O Unit. Reporting to the Commissioning Manager Responsible for Internal inspection of vessels for final closure. Involved in walk down punch lists and signing off certification and arranging and co-ordinating vendor visits and handover. Coordination of equipment vendors/subcontractors during commissioning activities. Assist in the training of start-up & operations personnel. Completion of Commissioning Function Test Procedures (FTPs) and liaison with construction and completions personnel. Planning of commissioning activities. Status reporting of commissioning progress as required by the project. Assistance (& where applicable, support to sourcing) of commissioning tools/spares/consumables. Production of commissioning work packs in line with project procedures. Verification and acceptance of completion and commissioning handover packages in line with the agreed system handover schedule. Responsible for ensuring Construction completed by system to facilitate Commissioning. Then take over as Commissioning manager and do all necessary testing and proving of the system finally handing over to the client. This includes all commissioning paperwork and final contract documents including POV procedures and verification.

 

Handover Coordinator

Hand over Coordinator responsible for ensuring a smooth hand over between parties at all points in the project and ensuring all paperwork is correct using Opercom and Icaps. South Pars phase 2/3 on contract to Total Fina Elf Paris. Working in a start up team to achieve a safe introduction of hydrocarbons to the plant Equipment included: Slug Catcher, Methanol Injection, Crude Stabilizer, Desalters, Flash Gas, Oil metering, Coalescers, Inlet Gas Compressors, Oil Export Storage Tanks and Pumps, Off Spec Tank, LPG storage, Metering, Propane Refrigeration, MDEA and AGR, inlet Dryer, Regen Gas Compressors, Caustic System,Turbo Expander, Demethaniser, Debutaniser,, Fuel Gas, Claus Reactors, Incinerator, Quench Column, sulphur Liquid Storage and Solidification & Handling, Sales Gas Compressors and Gas Metering, Pig Launchers and Receivers and R.O Unit. Reporting to the Operations Manager Responsible for Internal inspection of vessels for final closure. Involved in walk down punch lists and signing off certification and arranging and co-ordinating vendor visits and handover. Coordination of equipment vendors/subcontractors during commissioning activities. Assist in the training of start-up & operations personnel. Completion of Commissioning Function Test Procedures (FTPs) and liaison with construction and completions personnel. Planning of commissioning activities. Status reporting of commissioning progress as required by the project. Assistance (& where applicable, support to sourcing) of commissioning tools/spares/consumables. Production of commissioning work packs in line with project procedures. Verification and acceptance of completion and commissioning handover packages in line with the agreed system handover schedule.

 

Technical Author

Technical Author writing Operational Test Procedures for Process and Utilities inc: Delayed coker, Sulfur rec, D/CDU, VDU, NDHT,MHC, Water, Steam, N2,DCS etc. Then Commissioning Co-Ordinator for Project Utilities Using Opercom and Icaps. Technip Paris for SINCOR (TOTAL) at Jose Venezuela.

Commissioning Engineer

Commissioning Engineer Grange mouth Polyethylene Expansion Project PP3/Pex Page & Sambrook on contract to BP, Responsible for pre-commissioning / commissioning activities on a 300,000 kt/pa polyethylene expansion project including reaction, de-gassing, extrusion and utilities .

Pre-Commissioning Manager

Pre-Commissioning Manager Ruwais Refinery Expansion Project, Consolidated Contractors International Company, Responsible for pre-commissioning activities on an 180,000 bopd refinery expansion project including condensate fractionation, de-sulpherisation, tankage and utilities.

 

 

Senior Commissioning Engineer

Senior Commissioning Engineer, Western Route Pipeline Kvaerner Process Azerbaijan, Responsible for the whole of Azerbaijan on the Western Route Pipeline including Meter Stations.

 

 

 

Safety Permit Coordinator

Safety / Permit Coordinator, Ots / BP Venezuela Responsible for permit issue and safety during combined ops.